|
29 ROAD PROJECT
The concept of developing a
corridor to connect US Highway 50 to Interstate 70 has been under
consideration since the early 1980's. Potential benefits of this
connection include:
-
Better access to and from
Orchard Mesa through an additional bridge crossing of the Colorado River
-
A reduction in traffic demand
on the existing 5th Street Colorado River crossing.
-
More direct access to I-70.
-
Better access to commercial
and residential areas.
-
An overall reduction in
out-of-direction travel.
|
|
For more information call 244-1765
or Email:
Pam.Hawkins@mesacounty.us
|