This project is located in Whitewater, CO, at the corner of Turner Avenue and Rodgers Drive.

This corner was raised which caused a drainage problem at this location. 

Approximately 150 feet (+/-) of both Turner Avenue and Rodgers Drive will be re-lowered to reestablished the pre-existing drainage pattern prior to road raising and installation of a makeshift catch basin and retention pond over the existing sanitary sewer trunk line. 

The existing retention pond will also be filled in and flowfill will be placed in a cavity above the existing sanitary sewer trunk line.

Information Packets 

Available on Monday, August 28, 2023

Proposals Due 

10:00am- Friday, September 15, 2023

 Awarded Contractor:  MA Concrete, $70,104.15

 